450 MW TUFANBEYLI (ADANA) LIGNITE POWER PLANT
CLIENT |
Enerjisa Enerji Uretim A.S. |
CAPACITY |
Power plant consists of 3 units with 450 MW generation and
designated to have low water consumption. |
SCOPE |
Supply of Electro Mechanical materials for generation side and substation
side and all installation works of Power Plant |